Projected Moving Average
A lag-compensated moving average that uses linear regression slope to project the average forward.
Usage
Use as a predictive moving average that uses linear regression projection to anticipate where price will be rather than where it has been, reducing effective lag.
Background
The Projected Moving Average uses linear regression over the lookback window to project the best-fit line forward to the current bar. This predictive approach shifts the MA output toward the leading edge of price movement, achieving reduced lag compared to conventional MAs of the same period.
Parameters
length(default: 20): Calculation length
Formula